Fly ash sampler sampling

time:2023-11-25 22:42:41Views:

1. Determination of Sampling


The sampling of fly ash sampler is selected on the flue between the outlet of the air preheater and the inlet of the dust collector. The specific installation location should generally meet the following conditions:


The flue gas temperature is less than 370 ℃;


At the straight pipe outer wall of the horizontal flue, and at a height of 1/3 of the flue from the bottom of the flue; Or at the straight pipe side wall of the vertical flue, and at a distance of 1/3 of the flue thickness from the rear wall of the flue;


There are no obstacles in the flue that affect positive sampling;


The representative parts of smoke flow velocity and dust particles;


There is a space outside the flue for the installation of measuring devices and normal operation.


2. Opening of sampling holes


According to the determined sampling location, remove the insulation layer of the flue after shutdown, and cut a 142mm (width) X232mm (height) rectangular hole on the flue wall for welding the rectangular flange.


3. Welding of canopies, flanges, and brackets


Remove the insulation layer of the flue between the canopy and the installation bracket of the measurement unit according to Figure 5, and then weld the canopy, rectangular flange, measurement unit installation bracket, extended angle iron, support angle iron, and pressure regulating valve installation plate separately (the welding position of the extended angle iron and pressure regulating valve installation plate depends on the on-site situation). When welding, it is necessary to ensure that the distance from the bottom edge of the rain shelter to the rectangular flange is 130mm; 2. The installation surface of the rectangular flange is perpendicular to the ground; 3. The distance from the installation surface of the rectangular flange to the flue wall is 350mm; The distance between the installation bracket of the measuring unit and the rectangular flange is ensured by the welding auxiliary connecting plate.


 

手機導入圖片 1202.jpg

手機導入圖片 1205.jpg

手機導入圖片 1204.jpg

If the sampling unit is not installed temporarily, the square holes on the rectangular flange should be covered with the flange cover provided by the manufacturer and tightened with screws to ensure the sealing of the flue during boiler operation.


4. Welding of on-site control cabinet installation bracket


The installation bracket of the control unit can be welded between two measuring units or on a steel column near a certain measuring unit according to the on-site conditions. During welding, the height from the edge of the installation bracket to the on-site walkway or platform surface should be about 1.8 meters.


5. Installation of sampling unit


6. Adjust the sampling tube


According to the different positions of the flue installed in the sampling unit, it is necessary to adjust the sampling tube to ensure that the direction of the intake nozzle of the sampling tube is aligned with the direction of the flue gas flow. Adjustment method: 1. Loosen the nut (1), 2. Loosen the long nut, 3. Pull out the sampling tube in an upward direction until the cylindrical pin on the circular flange of the sampling tube is detached from the installation plate. 4. Rotate the sampling tube according to the flow direction of the throat at the installation position, so that the intake nozzle of the sampling tube is facing the direction of the smoke flow. Then insert the cylindrical pin on the circular flange of the sampling tube into the corresponding positioning space on the installation plate. 5. Tighten the long nut, 6. Finally, tighten the nut (1).


7. Installation of measurement units


Installation method: 1. Place the measuring unit on the installation rack and place a spirit level (provided with the equipment) on the measuring unit section; 2. By adjusting the lifting of the four bolts and rods at the bottom of the measuring unit, combined with the stable horizontal movement of the measuring unit, the ash inlet of the measuring unit is concentric with the lower ash outlet of the sampling unit cyclone dust collector. At the same time, the transition pipe component can precisely connect the lower ash outlet of the sampling unit cyclone dust collector and the ash inlet of the measuring unit; 3. Fine tune the 4 rod bolts at the bottom of the measuring unit, while observing the level of the measuring unit, so that the surface of the measuring unit is in a horizontal state; 4. Tighten the nut of the transition pipe component between the measuring unit and the sampling unit cyclone dust collector; 5. Tighten the four parallel nuts of the rod bolts at the bottom of the measuring unit; 6. Tighten the four tie rod bolts at both ends of the bottom of the measuring unit and tighten the nuts; 7. After the installation of the measurement unit is completed, restore the insulation layer and protective iron sheet on the flue wall.


產品動態

Fly ash sampler sampling生產廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

主站蜘蛛池模板: 91亚洲欧美 | 日本欧美老湿视频 | av视频一区二 | 亚洲国产成人资源在线软件 | 欧美日韩日本 | 2024亚洲va在线va天堂va国产 | 国产久久久国产精品小说 | 亚洲一区AV在线观看无码漫画 | 精品国产乱码久久久久软件 | 99久久免费精品 | 苍井空免费av | 海角国精产品一区一区三区糖心推荐 | 日日噜噜夜夜狠狠视频buoke | 国产四虎精品无码不卡免费 | 99精品与95优品 | 色偷偷影院 | 麻豆av一区二区无码 | 国产调教免费专区 | 久久五月丁香激情综合 | 久久爱手机在线观看 | 97国产精品手机 | 久久久久无码精品 | 精品一线二线三线区精华液 | 无码中文字幕aⅴ精品影院 无码孕妇孕交在线观看 | 日韩欧美一区二区三区在线播放 | 91麻豆国产语对白在线观看 | 无码专区人妻系列视频 | 丰满人妻妇伦又伦精品国产 | 国内精品久久久久鸭 | 久久精品国产亚洲不av麻豆 | 中文精品一卡2卡3卡4卡国色 | 熟女人妻上司中文字幕 | 无码欧美毛片一区二区三在线视频 | 国产三级片网站在线观看 | 最新国产三级 | 无码av中文一区二区三区桃花岛熟女电影国产狠狠免费视频 | 免费视频精品一区二区 | 无码人妻少天天躁夜夜躁狠狠综 | 国产网曝门亚洲综合在线 | 免费视频国产在线观看网站 | 99视频免费 |